Get in touch: sales@hermeq.com

Fast & Affordable Nationwide Delivery

VAT Display

Need help? Give us a call

0800 043 2520

Give us a call: 0800 043 2520 or Email at sales@hermeq.com

30 Day Invoicing For

Trade Accounts

 

K-Form K135 Screed Rail

Product Highlights

  • Eco-friendly UPVC construction - Lightweight, efficient alternative to traditional formwork.
  • Enables consecutive pours - Simplifies multi-bay installations.
  • Leave-in-place system - Saves labour time and reduces material waste.

SKU KF1519

The K-Form K135 screed rail delivers an eco-friendly, efficient alternative to traditional formwork for concrete pouring. Designed for 150 mm to 225 mm pours, it allows adjoining bays to be poured consecutively. This UPVC Screed Railing provides the construction industry with an economical, efficient and environmentally friendly alternative to steel and timber formwork.

£30.31 £36.37

Quickest Available Delivery: Up To 5 Working Days Final shipping costs and times are calculated at checkout. Shipping address may affect available delivery methods & times.

The K-Form K135 screed rail is a revolutionary solution for professional concrete pouring. Manufactured from UPVC, this lightweight, durable screed rail provides an eco-friendly alternative to traditional steel and timber formwork. Designed for pours between 150 mm and 225 mm thick when used with the K25 Riser, it supports seamless construction across adjoining bays. Its pre-drilled base and face simplify anchoring and dowel placement, saving valuable time on site. Once concrete is poured, K-Form remains in place, eliminating the need for removal and cleaning.

  • Eco-friendly UPVC construction - Lightweight and reusable solution for site applications.
  • Enables consecutive pours - Simplifies multi-bay installations.
  • Pre-drilled anchoring holes - Speeds up setup and alignment.
  • Leave-in-place system - Saves labour time and reduces waste.

The integrated wear strip can be removed post-cure for straightforward joint sealing, while the permanent UPVC formwork eliminates the need for dismantling.
Designed to minimise environmental impact and maximise site productivity, the K-Form K135 supports sustainable construction practices.

Whether used for road construction, warehouse flooring or infrastructure development, this advanced screed rail delivers consistent results and long-term performance.
HERMEQ stock a wide-range of Road Forms, Groundworks, Ground Mats & Road Plates conforming to all required safety specifications and regulations.


Need any help? Contact HERMEQ Today.

Contact our team via phone 0800 043 2520, email sales@hermeq.com or use our live chat feature between 8:00am & 17:00pm for help discovering our range.

  • Designed for pours of 150 mm-225 mm thick concrete (when used in conjunction with K25 Riser)
  • Enables adjoining bays to be poured consecutively
  • Pre-drilled holes in base for anchoring with mortar
  • Pre-drilled holes in vertical face for locating dowel bars
  • Once concrete is poured, K-FORM is left in place; no need to remove and clean
  • Separate wear strip can be removed once concrete is set to allow joint sealing

What is the K-Form K135 screed rail used for?

It provides a durable, eco-friendly formwork solution for accurate concrete slab pouring between 150 mm and 225 mm thick.

Does the K-Form screed rail require removal after pouring?

No, it is a leave-in-place system, saving labour and reducing site waste.

Is it suitable for large construction projects?

Yes, it supports multi-bay concrete installations and is ideal for civil engineering and commercial flooring works.