Partitioning
Factory partitioning from HERMEQ divides workshops, warehouses and construction sites into defined work areas with solid steel panels. The panels bolt to floor-fixed posts with Top Hat brackets, so a run goes up with hand tools and can be adjusted when the layout changes. Clear partition lines keep work zones, storage and pedestrian routes apart, and a busy floor is easier to manage and safer to work on as a result. Each panel is profiled steel cladding on a steel channel frame, finished galvanised, painted or powder coated, and built for daily contact with trolleys, pallets and plant in high-traffic factory spaces and on construction sites.
Steel factory partitioning panels
Both panel types are solid steel bolted to steel posts, and the choice between them follows how long the layout will stay in place and how often it will change.
Factory partitioning panels
The factory partitioning panels are for internal walls that will stand for months or years, such as welding and grinding bays, storage enclosures and fixed lines across a manufacturing floor. The panels are solid from top to bottom, so they screen what is behind them as well as marking the boundary. The system is modular, and a run is lengthened or shortened one panel at a time.
Steel factory partitioning on base-plated posts
Steel factory partitioning stands on base-plated posts that bolt straight down to a concrete slab or other solid surface. It is the choice for layouts that are adapted often, such as tool bay separation, corridor guidance and temporary work zones, and for jobs that run from a factory floor into construction work areas and plant enclosures in logistics depots.

Warehouse and workshop partitioning uses
Welding and grinding bays
A continuous steel panel keeps the arc out of sight of people walking past the bay. Leave an opening wide enough for the operator and the material going in and out, and keep combustible stock away from the outside face of the partition.
Storage enclosures and tool bays
Solid panels hide what is stored behind them and define an area that only the people who use it need to enter. Size the enclosure around the stock or tools it holds, with room inside for a pallet truck to turn, and place the opening on the side where deliveries arrive.
Floor segregation and walkways
On production and warehouse floors, partition lines separate pedestrian routes from forklift aisles and divide one process from the next. Sightlines matter more than screening here, so stop the run short of crossing points and corners where drivers and pedestrians need to see each other. Where forklifts work close to the line, crash barriers set in front of the partition protect it and the people behind it.
Site work zones and service areas
On construction sites and in logistics depots, the same panels enclose plant and equipment, restricted zones and back-of-house service areas. Keep fire exits and emergency routes clear of the line, and leave a wide enough gap for plant to be moved in and out. At the building boundary, steel wall hoarding and the wider permanent fencing range continue the line outdoors.
Partition heights, finishes and layout
Choosing a panel height
The range is made in 2.0m and 2.4m heights, and the job behind the partition decides which. The taller panel suits welding and grinding bays, storage enclosures and restricted areas, where the extra height screens more of the work and is harder to see or reach over. The lower panel suits floor segregation, walkway lines and tool bays, where the partition marks a boundary and sightlines along long runs matter.
Finish and zone colours
Panels and posts are supplied galvanised, painted or powder coated in several colours, with one face finished as standard and both faces available. A colour for each zone lets a quarantine store, a hot work bay and a pedestrian route be told apart at a glance, and HERMEQ powder coats in-house, so panels and posts in the same colour match along the run. Galvanised steel is the choice for wet or exposed areas such as loading bays and outdoor service yards.
Planning the run on the floor
A run is planned from a line marked on the slab, with the panels, posts, corners and junctions counted from it. Every change of direction and every tee needs a post, and the slab under each post should be solid concrete clear of expansion joints, drainage channels and buried services.

Partitioning posts, brackets and lighting
Partitioning T posts
Partitioning T posts bolt to the floor and hold the panels upright, with a connection on both edges, so one post continues a straight run or forms a junction where two lines meet. They come in the same heights and finishes as the panels, which keeps a coloured run consistent from end to end and lets a complete system be ordered in one basket.
Top Hat brackets and M10 bolts
Top Hat brackets and M10 bolts fix each panel to its posts and tighten with standard tools. They fit intermediate and corner posts, so one fixing type covers the whole run.
Hoarding and bulkhead lights
Partition lines in dim aisles, unlit bays and areas used out of hours can be lit with battery powered hoarding lights, the same units used on steel site hoarding, which mount on the panels and run without mains power. The bulkhead lights switch between flashing and steady light, to mark the end of a run or light a walkway beside it.
Popular Categories

V Mesh Perimeter Fencing
View Products >

Palisade Fencing
View Products >

Domestic Fencing & Railings
View Products >
Frequently Asked Questions
Can factory partitioning be moved after it is installed?
Yes. The panels are bolted to their posts with Top Hat brackets and the posts are bolted to the floor, so a run can be unbolted, moved and refitted in a new layout. The brackets and bolts can be reused, and extra panels and posts can be added to lengthen a run or form new junctions.
Does steel partitioning have to be fixed to the floor?
Yes, the posts are made to bolt down to a solid floor such as a concrete slab, and that fixing is what holds a run of steel panels upright. For a freestanding line on open ground outdoors, HERMEQ on-ground fencing is the range to use.
Can steel partitioning be fitted while the building is in use?
In most buildings it can, because the system is dry assembly with no wet trades or curing time. Posts are bolted to the slab and panels fixed to them with brackets, and drilling the floor is the only noisy or dusty step. Fitting one zone at a time, with the area being worked on closed off from traffic, keeps the rest of the floor running.
What is the difference between factory and warehouse partitioning?
The panels and posts are the same, and the difference lies in the job they do. In a factory, partitioning usually screens processes such as welding and grinding and separates one production line from the next. In a warehouse, it more often encloses stock, divides storage areas and keeps pedestrian routes clear of forklift aisles.
Can the same system be used for steel site hoarding?
Yes. The partitioning panels fit HERMEQ hoarding posts and use the same Top Hat brackets and M10 bolts as HERMEQ steel hoarding. A contractor can run internal work zones and external site hoarding on one fixing system on the same project.
Where is HERMEQ steel partitioning made?
HERMEQ manufactures its steel partitioning panels and posts in the UK and processes its own steel for them. The range is held as permanent UK stock and delivered nationwide.










































































































































