HERMEQ timber hoarding encloses construction and demolition sites behind a solid, continuous screen that keeps the public out and the work out of sight. The range runs from OSB chipboard kits for short programmes, through standard plywood hoarding built to the specification councils commonly ask for, to advanced kits with heavier posts and full capping for longer, exposed runs. PCH hoarding mounts a plywood screen on a concrete barrier base for busy roadside sites, and loose 18mm structural plywood sheets cover repairs and site-built runs. Every kit is manufactured in the UK, and an online calculator prices standard and advanced builds to the length of the site.
Plywood, OSB and concrete-based timber hoarding
Programme length, the traffic passing the line and how much of it faces the public decide which build suits a job.
Plywood timber hoarding
Hardwood plywood boards to EN 636-2, screwed to treated softwood posts and rails, make up the standard build for demolition and construction frontages, sold as the plywood timber hoarding kit. It is the specification to choose where a local authority or principal contractor asks for conventional plywood hoarding on dug posts. The hardwood face takes paint and stands up to knocks from pedestrians and site traffic.
Advanced timber hoarding
Heavier posts set closer together, extra rails and a full set of top, bottom and infill capping make advanced timber hoarding the build for long programmes and exposed runs. Corner plots, open frontages and elevated ground put more wind on a hoarding, and the stiffer frame is designed for that load. The capping covers board edges and joints, which protects them from the weather and keeps the line presentable for the life of the job.
OSB chipboard hoarding
Oriented strand board on a lighter timber frame, supplied unpainted, makes OSB chipboard hoarding the entry-level build. It suits short programmes of around six to twelve months and low-traffic lines such as rear boundaries, plot divisions and compounds away from the public, where cost matters more than finish. Where the line faces a busy street or the job will run longer, one of the plywood builds is the better choice.
PCH concrete barrier hoarding
Interlocking precast concrete barrier blocks carry a plywood hoarding in the PCH concrete barrier hoarding system, so one line both screens the site and resists vehicle impact. It is the build for busy urban and roadside sites where traffic passes close to the perimeter. Each unit is lifted into place, so plan for crane, forklift or Moffett offloading when it is delivered.
Structural plywood sheets
Replacement boards, repairs and extensions to a run are covered by loose 18mm structural plywood sheets, cut to the standard size that common hoarding frames are built around. Contractors who frame their own hoarding, or who need to board up a doorway, window or materials compound, use the same sheets, which have one smooth face for paint. The sheets are available for next day delivery.

Timber or steel site hoarding
Timber hoarding is the right choice when the perimeter will stand in one place for the length of the job: a long-standing frontage, a demolition hoarding built to a council's specification, or a line that needs a continuous solid face for paint, signage or custom printing. It is built to fit the site, following corners, changes in level and awkward boundaries without gaps between bays. Steel site hoarding is the better buy where panels must be moved, re-sited as the phases of a job change or taken on to the next project, because the panels clamp together, stand on feet or stabilisers and can go up and come down many times. A project that needs both can run a fixed timber hoarding along the street frontage and relocatable steel hoarding around internal compounds and phased work areas.
Dug-in posts or ballasted hoarding
Most timber hoarding stands on posts set in the ground, and where digging is not possible the line is held by weight instead. On open ground, posts go into dug holes and are fixed with rapid-setting Postcrete, which is poured dry into the hole and needs only water, so a gang can set a run of posts and move straight on to the rails. Where buried services, a concrete or tarmac hardstanding, a basement slab or a short programme rule out excavation, concrete ballast blocks used as kentledge, or the concrete base of the PCH build, hold the hoarding without foundations.
The method matters more for hoarding than for fencing. A solid board face catches the full force of the wind across every bay, while open mesh temporary fencing lets most of it pass through, so hoarding needs deeper embedment or heavier ballast over the same length, and exposed locations need more again. Before any hole is dug, the line should be checked against service drawings and scanned with a cable avoidance tool, and any stretch that crosses buried cables or pipes moved over to ballast.

Hoarding for construction and demolition sites
A demolition hoarding is judged on containment, while a construction frontage is judged on presentation.
Demolition sites
The hoarding has to contain debris and keep the public clear of the work area, which makes full height and an unbroken face more important than finish. Where noise from breaking and crushing is the concern, acoustic barriers fitted inside the line reduce the noise that reaches neighbours.
Construction site frontages
The public sees a frontage every day of the build, so a painted face with capping along the top and bottom presents better and lasts longer than bare board. Access points for deliveries and staff are best planned before the run goes up, with site gates set into openings left in the line.
Timber hoarding cost per metre
Build and length set most of the price of a run. Board type comes first, with OSB the lowest-cost face and standard plywood, or MDO plywood with its smooth overlaid surface, costing more. A heavier frame with more posts along the run adds timber and labour, full capping adds material along the top, bottom and joints, and a painted finish costs more than unpainted board. Run length sets the quantity of board, posts and capping the order needs, and gates, corners and any ballast needed where posts cannot be dug in are added on top.
The timber hoarding calculator prices a standard or advanced build to the total length of the site, with options for the board, the colour and the capping. It breaks the run down into the materials it needs, so the cost per metre can be set against the programme and budget before ordering.

Popular Categories

Temporary Site Hoarding
View Products >

Temporary Mesh Fencing
View Products >

Vehicle & Pedestrian Gates
View Products >
Frequently Asked Questions
Do you need a licence for site hoarding?
Hoarding that stands on, or projects over, a pavement or road needs a hoarding licence from the local highway authority before it is put up, under the Highways Act 1980. The licence sets conditions such as the footway width left clear, lighting at night and how long the hoarding can stay. Hoarding built entirely inside the site boundary does not need a highway licence, though adverts displayed on it can need advertisement consent.
Does timber hoarding need a temporary works design?
Hoarding is a temporary works structure, and a solid timber line carries enough wind load that most principal contractors require a temporary works design for it. The design confirms the post size, embedment depth or ballast and bay spacing for the height of the hoarding, its exposure and the ground it stands on. It is normally checked and signed off through the project's temporary works coordinator before the run goes up.
How high is construction site hoarding?
Most timber site hoarding is built to the height of a full sheet stood on end, around 2.4 metres, which stops the public seeing or reaching into the site. The PCH build reaches the same height with the hoarding mounted on its concrete base. Taller hoarding can be built, and it needs a heavier frame and its own temporary works design.
Is plywood hoarding sustainable?
Plywood is a renewable timber product, and the builds priced through the timber hoarding calculator can be specified with FSC-certified board made to EN 13986, with E1 and CARB2 low-formaldehyde emission ratings. Boards from a dismantled run can be reused for other site work, and timber that cannot be reused goes into timber recycling streams.
Can timber hoarding be branded?
Plywood hoarding takes paint in contractor or client colours, and the timber hoarding calculator lets you choose the colour and capping finish of a standard or advanced build. Printed graphics, project boards and hoarding wraps can be fixed to the smooth face of the board. HERMEQ's Custom Printing range supplies printed covers and graphics for site perimeters.
Can gates be fitted in a timber hoarding run?
Gates are fitted by leaving an opening in the run and hanging a vehicle or pedestrian gate on posts set heavier and deeper than the line posts, because the gate leaves and the wind on them put extra load on those posts. Size the opening around the largest delivery vehicle expected on site, and hang the leaves to open into the site so they never swing across the footway. HERMEQ's Vehicle & Pedestrian Gates range covers both types of access.