Timber Hoarding - Advanced
Product Highlights
- Heavy-duty design - Ideal for long-term hoarding construction on demanding sites.
- Reduced post centres (2.7m) - Greater strength and wind resistance.
- Includes full capping set - Top, bottom and infill capping for durability and finish.
SKU MP2595
The hoarding structure is installed at 2.7m centres using reinforced timber rails and painted in grey to match urban compliance and visual consistency standards.
Key Features:
- Enhanced stability through 9x3 posts and 2.7m post spacing for challenging site conditions.
- Top and bottom timber capping protects edges and improves aesthetic value.
- 18mm plywood hoarding panels withstand weather, paint, and site activity.
- Perfect for site hoarding on construction projects lasting 6–12 months.
- Supplied painted grey to reduce on-site finishing time.
The system is engineered for demanding environments where standard timber hoarding may fall short. Site managers opt for this kit to ensure their hoarding for construction remains straight, secure and professional looking for longer periods — particularly in high-traffic or urban settings. Compatible with HERMEQ post concrete and fencing accessories, it can be installed rapidly by two-person teams.
HERMEQ stock a wide range of Standard Timber Hoarding, OSB Chipboard Hoarding, and Advanced Timber Hoarding to suit all durations, budgets and specification needs.
Need any help? Contact HERMEQ Today.
Contact our team via phone 0800 043 2520, email sales@hermeq.com or use our live chat feature between 8:00am & 17:00pm for help discovering our range.