Tree Protection
Tree protection fencing closes off the ground around retained trees on development projects. It keeps plant, materials and excavation away from the roots, trunk and lower branches while the work goes on. HERMEQ supplies tree protection fence systems for construction sites and events in three temporary forms: braced scaffold tube, Heras panels on stabilisers and timber posts set in postcrete. All three are listed as compliant with BS 5837. The range also includes a permanent metal tree guard for pavement trees. Every system is manufactured in the UK.
Tree protection fencing systems
The range splits into temporary tree protection fencing, which holds a construction exclusion zone for the length of the works, and a permanent metal guard that protects a street tree once the site is finished.
Scaffold tube tree protection fencing
Scaffold tube tree protection fencing is the heaviest barrier in the range. It is a frame of vertical, horizontal and raking tubes with HERMEQ anti-climb mesh panels fixed to it, braced so that it holds its line when struck. It follows the braced scaffold framework that BS 5837 shows as its default barrier, so it is the system to order where the planning condition or tree protection plan asks for that frame. It is also the right choice where excavators, telehandlers and delivery vehicles work close to the zone, and on sites with Tree Preservation Orders that need strict local authority approval.
Heras and stabiliser tree protection fencing
Heras panels become a tree protection barrier once they stand in rubber feet and are braced with stabilisers pinned into the ground. The Heras and stabiliser tree protection fencing system supplies the panels in that form. It suits grass and soft ground, where the pins hold the stabilisers firm. It is the fastest of the three temporary systems to erect, and the quickest to lift and reposition between phases of work. Choose it for smaller sites, short programmes and tree protection plans that accept stabilised panels in place of a scaffold frame.
Timber post tree protection fencing
The timber post tree protection fencing system sets square timber posts in postcrete, and the mesh panels are clipped to the posts. The line is fixed in the ground and stays where it was set. That makes it the cost effective choice for longer programmes on ground that can be dug for posts, where the fence will not need to move until the job is done. Post height is chosen when ordering.
Metal tree guards for pavements
The metal tree guard for pavements is a permanent guard in galvanised, powder coated steel. It protects the stem of a young tree in a pavement, precinct or retail street from pedestrians and vehicles while the tree grows. It is for councils, developers completing public realm and facilities teams responsible for the finished streetscape. It does not form a construction exclusion zone, so a tree with building work still going on around it needs one of the temporary systems until that work is complete.

BS 5837 tree protection fencing and Tree Preservation Orders
BS 5837:2012, Trees in relation to design, demolition and construction, is the British Standard for tree protection fencing. It asks for a barrier that is fit for purpose: one that keeps people, plant and materials out of each retained tree's root protection area for the whole of the works. The project arboriculturist specifies that barrier in the arboricultural method statement and draws its line on the tree protection plan. The local planning authority often makes both documents a condition of planning consent.
Work on a tree covered by a Tree Preservation Order needs the local authority's consent. Work on a tree in a conservation area needs prior notice to the authority. Cutting down, lopping or wilfully damaging either kind of tree without that consent or notice can lead to prosecution and a fine. On these sites the protective fence is the visible evidence that the protection agreed at planning is in place.
The standard describes more than one form of barrier. The tree protection plan or planning condition usually names the form expected on that site, often by reference to a figure in the standard. Match the order to that document. A plan that shows a braced scaffold frame calls for the scaffold tube system. A plan that accepts panels on stabilisers or fixed posts can be met with either of the other two systems.
Tree protection during construction
Housing and commercial development
Retained trees on housing and commercial schemes often stand beside plot boundaries, access roads and the site compound. The fence has to hold its line against deliveries, turning plant and material drops for months at a time. Site set-up is planned around the zones, with welfare cabins, skips and material stores kept outside them. Where the plan allows the build to encroach for access or scaffolding, the fence is set to the agreed line and the uncovered ground is protected as the method statement specifies.
Demolition and site clearance
Demolition brings long reach machines, falling material and dust closest to retained trees. Clearance then tracks plant over ground that may not have been driven on for years. Where plant will swing or reverse beside the zone, a braced barrier is the sound choice. Crushers, spoil heaps and stockpiles of arisings stay well outside the fence line.
Utility, highway and landscaping works
Service trenches, kerb lines and drainage runs are routed outside the root protection area. Where the method statement allows, they can pass through it by hand digging or trenchless methods, and the fence marks where machine digging stops. On verges and highway schemes the run is often long and narrow beside live traffic. On landscaping work the risk comes from topsoil, paving and mixing points set down against the fence, so everything stored or mixed stays on the working side of the line.
Parks, estates and event sites
On parkland, estates and event sites the trees stand in grass. Most damage comes from compaction over the roots by vehicles, generators, marquees and crowds. The Heras and stabiliser system goes up around each tree before the build-in and comes down after the break-down without any digging into the turf. The anti-climb mesh keeps the public out of the zone while the event runs.

Measuring and ordering a tree fence line
Taking the run length from the tree protection plan
Every temporary system is priced through a length calculator, so the order is only as accurate as the run length entered. Take that length from the root protection area line drawn on the tree protection plan, not from the canopy. Measure the perimeter for each tree, or for each group of trees whose root areas merge into one zone. Where a zone meets a building, a site boundary or existing hoarding, only the open sides need fencing. Allow for each corner and for any join with an adjoining run. For the timber system, the calculator also asks for post height.
Panels, clips and fixings
The calculator returns a pricing and component breakdown for each run. The three temporary systems carry the same HERMEQ anti-climb mesh panels as the temporary mesh fencing panels range. Spare clips and fixings for repairs, or for extending a line during the job, come from the temporary fencing clips and accessories range.
Storing and reusing panels between jobs
The panels are the standard mesh panel, so a contractor already holding perimeter fencing can use the same stock for tree protection. When the zone comes down, the panels return to perimeter use. Between jobs they stack in fencing stillages alongside the rest of the company's temporary fencing.
Popular Categories

Temporary Site Hoarding
View Products >

Temporary Mesh Fencing
View Products >

Vehicle & Pedestrian Gates
View Products >
Frequently Asked Questions
What is a construction exclusion zone?
A construction exclusion zone is the fenced area around a retained tree, usually matching its root protection area, that is closed to construction activity for the duration of the works. Nothing is stored, parked, mixed, dug or burnt inside it, and ground levels are left as they are. Compaction and spills over the roots can kill a tree years after the job has finished.
How far from the tree should the fence go?
The fence goes on the line of the root protection area shown on the tree protection plan. The arboriculturist calculates that area from the trunk diameter. It can be reshaped where roots are likely to have been restricted, for example by an existing road or wall, so it is not always a circle. The position is taken from the plan, never judged by eye on site.
When does tree protection fencing go up and come down?
The fencing goes up before any work starts on site, including demolition, clearance and the arrival of plant. The arboriculturist or local authority often inspects it before works begin. It stays in place until all construction and any landscaping that needs machinery is finished. Removal is normally agreed with the arboriculturist or planning officer where a planning condition covers tree protection.
Can tree protection fencing be moved during the works?
Tree protection fencing can be moved only with the agreement of the project arboriculturist or the local planning authority. Any move is normally a step written into the arboricultural method statement, such as a phased change of line to allow a specified operation. Moving or opening the fence without that agreement can breach the planning condition.
Do trees without a Tree Preservation Order need protective fencing?
Trees without an order often need protective fencing too. A local planning authority can require it by planning condition for any tree shown as retained on the approved plans, whether or not the tree carries a Tree Preservation Order or stands in a conservation area. Breaching that condition can lead to enforcement action. On sites without a condition, the same fencing protects any tree the client wants to keep.
What signs go on tree protection fencing?
The fence carries signs that identify the construction exclusion zone and prohibit entry, with wording such as 'Construction exclusion zone: keep out'. The signs are fixed at intervals along the run and face the working area. Some tree protection plans and planning conditions set out the wording and spacing, and the signs need to stay legible for the whole job.