Temporary Site Bridge
SKU WO79003z-1
The Temporary Site Bridge is a robust, modular access solution designed to support safe foot traffic across scaffold gaps, materials zones, and incomplete deck areas on construction sites. Built for quick deployment, it features non-slip steps, a folding frame, and anti-folding safety locks, ensuring secure, efficient movement around scaffold structures during erection, modification, or dismantling phases.
Quickest Available Delivery: Quickest Available Delivery: 5 Day Delivery
Fully compliant with working at height best practice, this bridge provides anti-slip surfaces and durable handrails, supporting safe access during build, inspection or repair phases. It integrates easily with existing scaffold setups and can be repositioned with minimal effort.
Key Features & Benefits
- Quick-fit scaffold bridge with integrated side protection and grippy walkway surface.
- Lightweight and portable—ideal for temporary access between scaffold bays or platforms.
- Compliant with scaffold site access standards; anti-slip tread suitable for wet conditions.
- No permanent fixings required; designed to slot into scaffold bays or rest on platforms.
- Improves on-site safety while reducing downtime during work at height transitions.
Product Information
This bridge provides a walkable, secure surface for personnel needing to cross scaffold gaps, trenches, or segmented work areas. The high-visibility handrails and galvanised frame withstand daily foot traffic and the rigours of active scaffolding environments.
Perfect for sites with mobile access towers or temporary platforms where ladders or incomplete scaffold sections need bridging safely.
Assembly | Trench Width (mm) |
1 x 15 Step | 3597 |
1 x 18 Step | 4407 |
2 x 15 Steps | 6812 |
1 x 15 Step + 1 x 18 Step | 7646 |
2 x 18 Steps | 8456 |
Alternative Products
If you need wider or higher-capacity bridging, consider our Scaffold Access Stairway.Â
Â
HERMEQ stocks a wide range of equipment for Working at Height including Edge Protection Systems, Fall Arrest Systems, and Harnesses & Lanyards conforming to all required safety specifications and regulations.
Â
Need any help? Contact HERMEQ Today.
Contact our team via phone 0800 043 2520, email sales@hermeq.com or use our live chat feature between 8:00am & 17:00pm for help discovering our range.
Do I need a licence to install the Temporary Pedestrian Bridge?
No. The bridge is designed for use by professionals familiar with the installation manual. It does not require a civil engineering licence, but all installation steps must follow the supplied safety and maintenance documentation.
Â
Can the bridge be moved after installation?
Yes. Integrated crane lifting points and carry handles allow the unit to be repositioned without disassembly. It’s ideal for phased or mobile worksites.
Â
Does it come in different lengths or sizes?
The bridge features a modular construction, so it can be adapted to different gap widths or terrain features as required.
Â
Is it compliant with safety regulations?
Absolutely. The product meets European Safety Standards, including EN 13374 and BS EN ISO 14122, ensuring a reliable and compliant temporary access solution.